Posts Tagged ‘15 minute challenge’

h1

41.1 End of March 2017, Did you March A Long soldier?

April 2, 2017

Hey, I am going to keep this short. I did just accidentally erase another blog post just a moment ago.

It’s the end of March 2017, did you find yourself doing March A Long this year? #marchalong

This past week I worked on bobbins and getting these pieces cut down to 1.5 inches.

I am going to put plain black in between the double rows. I think it will look nice.

I ran out of pieces for it, so even though I want to make it bigger, I really can’t with what I already have cut.

Then one day I wrote up the entry form for my quilt going into the guild portion of the show. Quilt on the left below. 40 X 40. Grandma’s Footstool. It’s kind of a Grandma’s Choice block next to a Foot Stool block (from Quilter’s Cache).

Next to it is the 1.75 unfinished block quilt that will shrink to probably half the size when sewn together. Looks like I have 2 great leader and ender quilt projects.

But next, probably needs to be the quilting on the show quilt. Right now it’s only ditch quilted and I would like to do more. I found my drawing from a year ago.

Using this fancy thing called paper and pen. 😉

Anyway, I look forward to hearing about your month? Isn’t March Awesome? March-A-Long rocks!

 

Save

Save

h1

41.0 March A Long End of Fourth Week 2017

March 26, 2017

Well, today you’re going to get two posts from me. I had written and spoken the previous post last Monday night, but I didn’t post it. Then, things got hectic here – read – emotionally, and I really wasn’t able to deal with March A Long during the week this past week.

So today we are reporting in for both the 3rd week and the 4th week! I was just gonna skip the previous post, but, well it was already written and everything, it doesn’t take a TON to add the pictures up. And yes, I should have, could have posted on Tuesday when home, but …. eh …. not really.

Yesterday (Saturday) I put these up on the wall straight away once I awoke. They measure 1.75″ unfinished. Strange size, but as long as they ALL are that size, it won’t matter. This will look so tiny when done. Trying to decide if I am going straight black border on these.

I proceeded to cut some more of these, including a smaller version which prompted a different layout. There are lots of these too and are 1.5″ unfinished size.

I played around with layout of the stripies and I am liking the restriction of orange here. A couple of light greens are almost reading yellow/orange instead, but I think I gathered all the oranges and yellows otherwise in a pattern. The rest are very arbitrary.

Some other beauty that could also inspire quilts or be parts of quilts or are just pretty.

I also put up curtains in the kitchen, but regardless of my intent, I didn’t end up making them.

Anyway, I would like to know what you’re doing for #marchalong #march-a-long and #15minutesofsewing. I am missing hearing from everyone!

Save

Save

h1

40.8 End of Second Week March A Long 2017

March 12, 2017

I got this little 15 minutes of talking about our 15 minutes of quilting today, earlier than projected. Longer audio than originally planned.

Thanks to everyone who has posted already!

Yay, I got the paper removed from the ladders and bubbles quilt!

Boo, I wasn’t actually prepared to do that before the week was over!

I am waiting on more fabric to arrive by mail to figure out borders for it. Here’s some of what I already have. Most of the border will be darker, with hints of lighter, but I am still not sure on it yet.

My first inclination is to do this with it at this time.

I also might modify the spool block in here too since that would be a good compliment.

I was talking about donation quilts. Quilts for Cure posted a lot by String & Story. More info on the donation at the Quilts for Cure site. I am not participating, but several other people I know are and have been. These are the navy and yellow hearts.

I also wanted to share some beautiful henna and Moroccan style designs that reminded me of quilting designs. I wish I could do something this good. I put up a picture from an Etsy Store of an example of what I am talking about. Excellent work by LITDecor on Etsy.

 

Save

Save

h1

40.7 End of First half week of March A Long 2017

March 5, 2017

Hey guys, I put together audio for the end of the first half week of March A Long 2017.

We are sewing/quilting/prepping/organizing/shopping …. sewing & quilting tasks for 15 minutes a day for the month of March.

Personally I have been ripping out papers off of this guy.

20170301_163344.jpg

I am pretty haphazard with how the papers are being ripped. Some of today I was actually methodical in working on rows instead of just bouncing around everywhere.

Please feel free to report back in comment here, on any day. Next post will hopefully be up Monday afternoon or Tuesday early early morning the 14th due to previous engagements on this upcoming weekend.

I find it easier for me to wait until Sunday, but I know that’s not always convenient for all of you. Comment on this post or any other on March A Long, or link back to me. I will get links approved as fast as I am able, but I don’t always reply. But if I know you’ve posted somewhere, I will do a shout out in Audio Form.

Hope you enjoy!

Save

h1

40.6 Gearing up for March-A-Long 2017

February 26, 2017

It’s that time again – time to consider March – A – Long for the year 2017.

march-a-long-short

For the past several years I have “hosted” March – A – Long for the month of March.

This is an encouragement to sew/quilt/design/dream/read/shop …. about quilting for 15 minutes a day for the month of March!

Last year I made myself for the month of March focus specifically on Free Motion Quilting. I would like to replicate that this year if I can.

Feel free to join a long, which is why I call it an “-A-Long”, so we can all work together on furthering our quilting goals.

I always offer a chance for others to participate. Either here as a comment, or on the Scientific Quilter page on FaceBook. I can also be found on Twitter or Instagram. I haven’t been super active anywhere but the Twilters! group on FB, but I promise to check in these other places for the month of March during the March A Long.

You can either find me as scientificquilt (twitter), or scientificquilter (instagram). I make a pledge to post weekly during March A Long. Most years I am pretty close to “on the nose” on this.

I may do short audio like last year. That was sorta fun. At the current moment, I can’t remember where my audio ants are stored, but we might see if we can find it sometime before the end of the month. Maybe sooner than that, even.

I know for at least for a while, if I don’t have anything else to do, I can always remove the paper from this quilt.

20170225_090058

I think there are 99 blocks here, with several seams in each. I used regular paper too, which while I was sewing them together, wasn’t a bad idea. It’s cheaper, easier to access than the “made for paper piecing” paper that I have purchased in the past. But, the ripping out stage isn’t really quite as much fun.

Actually, neither was the “sewing all the lines together” part.

20170220_195524

My goals are three fold this month:

  1. Finish up this quilt top to see if I need borders. I wish I had more of the blue background to float some borders, I have just the idea for those. But, alas I do not, so this quilt may go with or without borders.
  2. Get as many small quilts free motion quilted as possible. I still have a small stack of quilts, some of which are basted and ready to go.
  3. Create adequate backing for other quilts I have been working on that have tops but not bottoms.

Anyway, I always enjoy hearing about others’ March-A-Long progress. State goals and successes here or other places you can find me!

Ready, Set, Quilt …. March along you little quilters! Drop & give me 20 …. stitches!

Save

h1

39.6 March-A-Long 2016 first week

March 6, 2016

2016-03-01-17.54.47.jpg.jpegI am testing out my Instagram skills this month to try to stay “on top of” pictures for the daily tasks of March-A-Long. March-A-Long is a commitment to sew/quilt/plan for 15 minutes daily during the month of March. As you can see above, this is the pieces of the new block of the month from Ula Lenz Stained Glass Ray of Hope quilt.

A lot of my personal time has been spent on Craftsy. Relearning Free Motion Quilting techniques & designs. I echo quilted the insides of this quilt, but not yet the outsides. Background fabric is too different, so I am going to decide what color works today for this small top.

2016-03-05-17.55.22.jpg.jpeg

If you’ve participated in sewing for 15 minutes a day in March, let me know! Glad to know I’m in such great company already!

Have a great week, and keep on getting those stitches in! Keep experimenting!

h1

39.3 Announcing March-A-Long goals 2016

February 28, 2016

March A Long Sewing

This is it! The first week of March approaches! I am thoroughly excited this year for March-A-Long. I have again made an audio file for you on my blog for those of you who like the audio reminder (and the ants).

A quick recap of what I discuss in the audio file:

  • Announce you’re going to play along
  • Pledge to quilt (in whatever that means to you) for 15 minutes a day just during March
  • Adjust time on the weekends if you need to
  • Set a timer if that helps on those busy weekdays
  • You’re not graded on this, so nothing is binding
  • You have lots of options to consider quilting tasks (lots of examples in the file)
  • Maybe add to a different day if you’re too backed up one day
  • Check-in weekly and I’ll announce who is playing along and who is meeting their goals
  • Maybe try to tackle something hard by breaking it down into smaller chunks
  • Maybe do something mindless or organizational
  • Maybe have a goal for the month, be okay for breaking the goal
  • Have fun, and thanks for joining along with me in the month of March

My personal goals for the month (to help me stay focused):

  1. Find appropriate backing and batting for small and large tops
  2. Practice free motion quilting on small tops
  3. Baste other small quilt tops needing basting and quilting
  4. Bind off Card Trick quilt
  5. Decide on quilting of Samurai Sudoku quilt
  6. Paper piece March hexagon from Ula Lenz
  7. Call and set up next long arm appointment
  8. Rearrange quilts on my wall behind my ironing board
  9. Make a video on how to make the disappearing shoo fly block
  10. Organize my blog a little more

I took my quilts out for the great weather to get their photographs. I have many small tops without backs and batting to practice on.

small tops to back and quilt

I also have some larger quilts to decide on batting and backing (this stack is on the back burner due to size and time).

Larger Quilt tops to Back and Quilt

And these are either basted or almost basted, ready to quilt sooner than the others

small basted quilts to quilt

Comment below or the previous post if you’re going to join in, and we’ll see how we do for this March-A-Long! Keep experimenting!