Posts Tagged ‘sewing for 15 minutes’

h1

42.5 Trimming up the last week of March A Long

March 23, 2018

It’s been a sorta boring month during the March A Long. I have been dutily trimming up these leftover squares every morning all month long.

I never knew that I had so many pieces to trim!

It’s been fun motivating myself to get to work as of late. I am glad I am finally taking care of this!

But, you guys, I came up with a cool round for the medallion quilt I am working on! So this is incredibly motivating me further. A little bit of YouTube video in the morning, a timer, and enough timevto squeeze in 12 + minutes before work, and some times the full 15. I even have been trimming when I get home if I felt like I was shorting myself out.

 

All the grey and orange pieces shown have been trimmed during the month of March. Plus another 96 pieces of other orange pieces not shown here.

Calculating all the pieces, I have trimmed since March:

The grey / grey border pieces are 6 X 9 X 4 pieces (one side not pictures for sewing purposes), or 216

The middle orange pieces are 7 X 4 or 28

The orange pieces on the side are 33 + 1 miscut piece

The grey / grey pieces 2.25 inches are 77

The grey /grey pieces that were sewn too small measuring 2 inches are 35

The original orange pieces not shown here are 96 I believe.

So, if I do my math right, I have trimmed up during the 15 minutes of sewing in March: (drumroll please)

 

486

 

Wow! That’s a lot of trimming, about 500 pieces trimmed up in March! Dang! This doesn’t include the light grey pieces I cut up to go with the half square triangle pieces.

Now to go through the task of sewing these pieces together. Maybe I will work on that this afternoon. See what motivation can be found in getting a large task off your back if done in really really small chunks! This was (mostly) with all “found time” that I wouldn’t have been sewing — okay I admit to probably doing a little more on the weekends, but dang! That’s a lot of trimming up!

What have you been doing in March A Long? Have YOU been doing the 15 minutes of sewing? Can you get a monkey off your back as well and work out something you keep putting off and putting off and putting off just like I have?

Or can you accelerate your thinking about your own quilting project even more than you already have?!

Thanks so much for playing along guys! I am very proud if you do for 1 day or for all 31!

h1

42.4 Pi Day in March A Long 2018

March 14, 2018

I finally have time to sit and write a blog post. The sun is finally shining for the second day in a row, the weather is nice, and it is 3-14 otherwise known as 3.14 or pi day as of late (American date style, I guess).

For March A Long, (or is it March-A-Long or is it March Along?) we are encouraging each other to sew for 15 minutes every day!

Anyway, I am so excited for the many people who are joining in sewing for 15 minutes every day, or at least trying to! When I first put up the post, I got a quick comment about how someone couldn’t make themselves ONLY do 15 minutes a day!

That’s super inspiring!!! Super unrealistic for me personally, but I am so stoked that I have at least one person I know that sews for more than that every day!! Probably more than that one person, in actuality.

I have heard more than one person who started setting up their 15 minutes and then kept going a little bit for several days in a row!

You are all inspiring! Check out by doing a quick search of the word #marchalong or #sqmarchalong on your favorite social media sites, and see what everyone else is up to!

For my part of doing March A Long, I have gave myself a rather boring and uninspiring task.

Trimming.

The little grey pieces in the picture on the design wall. Yeah, I’ve been trimming those up to something resembling square.

I decided to go with 2.25 each half square triangle. The most interesting I first thought to do was to put them on my wall like the picture above.

But then because I started working more on trimming the dark parts, I started putting them up in the design and I like this idea better than just plain diamonds.

So now I am going to try to make this work for a round on my medallion quilt.

Earlier last month I was attending a quilting retreat and all these yellow and orange squares I was making for a mystery quilt (Charlotte Hawkes Quilts) I am working on and I had to show off my matchy-matchy colored snacky.

This was the set of blocks I made too big because I didn’t follow the directions. But No Pie here.

Last fall I attended a retreat and put together a pie quilt of watermelon pie. Well Not exactly, but if you squint or don’t think about it too much, this Dresden quilt can be considered to be made of pie with the coloration of watermelon (my inspiration)

Which is actually the only pi I got right now.

Last night I gave a “short presentation aka update” on the guild opportunity quilt which I have designed, and I showed them that I wrote the pattern a second time for these blocks I made last fall.

It was the first time that several of the guild members received the instructions. I don’t know what about it made me so nervous about it.

Did I share that I had so many water melon pie pieces left that I have enough pie for a whole other quilt?

I hope this update is much more exciting than just a small bunch of triangle blocks, which has been the true and real update of what’s been happening in my sewing room since the last time I posted at the beginning of March!

Anyway, I am inspired to keep on sewing! Here’s looking forward to another half of the month that we can get our 15 minutes in every day! #marchalong

h1

42.3 Are you ready for March-A-Long?

February 28, 2018

Are you ready for March-A-Long?

Wait! I am not! Not really. We will make do this first few days this month.

Every year I like to “host” a month (March) where we encourage each other to sew for 15 minutes a day! This includes the weekdays, which I am terrible at sewing.

Somehow every year February gets shorter.

This year something grinded into the normally “well oiled gears” (aka something dramatic happened in personal life) and made this year even less prepared than ever to host March A Long.

No Pictures. Well maybe this one.

Something happened to the font size when I went to save it and I can’t understand what or why to fix it. New to me “graphics program”. (art originally done by my friend LynAnne in the background)

Anyway, if we want to encourage each other to sew for 15 minutes a day each day in march we can do so by using the hashtag: #marchalong in posts.

If people get creative and share, I can share back what others are doing.

I am not picky on what we call sewing for 15 minutes a day. While actual sewing is nice, sewing in the mind (planning/designing/looking on pintrest etc) will all count as well as the essential tasks of fabric shopping, cutting, tracing patterns.

I am not yet sure what I am going to do for March 1st (tomorrow as I type this), but I will come up with something. I may get my blocks out on my design wall and start planning out the wedges I have to make for my tilted blocks.

Or I could spend 15 minutes towards cutting down my dog-ears on my latest project.

I do have lots to share, and I may have to jump ahead a few months just to be more current and then double-back to catch up on sewing projects. I don’t understand why I make this blog posting thing so hard sometimes.

Talk to you more the next few weeks for sure!

h1

39.9 The end of March-A-Long for another year

April 3, 2016

March A Long Sewing

Frequent/expectant blog readers may have noticed a lack of posting anything last week. This was against my initial intentions, putting off the post too long last weekend made the post unable to happen as I was whisked away from the land of internets for a good day and a half last weekend. Seriously, there are still places in the US that are internet unfriendly.

Anyway, I think the gentle rip from my original plans was enough last weekend to knock the wind out of my (quilting) sails.

Any event, I am here now, a week later, discussing the end of March, the end of March-A-Long, the end of 15 minutes sewing every day.

Thanks go out to all who started and didn’t stop, all who marched loudly the whole month long, all who marched silently, all who wrote hashtags, all who did not, all who posted on social media – this blog, the FB page, twitter, instagram etc.

Thanks go out to all who took just a little more moments to think about quilting on a more daily basis than what they were doing before.

Thanks for encouraging each other, thanks for encouraging me, thanks for going along with this silly experiment in daily self-discipline!

As I state in the audio file, I really liked having a different focus for the month than normal that was broad enough to encompass a lot of different types of tasks. By saying I was doing more free motion quilting, I was doing more basting, more image pinning, more video watching, more drawing lines on pictures, more drawing lines on fabric, more changing of my needle, more thread changes, more foot changes than I had done in the last 11 months!

Way to go everyone!

By the way, I recorded this on April 1st outside, many bird noises and then a train noise that I completely didn’t notice too much when recording.

20160320_114608

 

h1

37.2 Silent March-A-Long almost finished

March 30, 2015

So, how did you do in the 15 minute a day sewing challenge for the month of March?

Did you let the stress of every day get to you, or did you challenge yourself to do a little bit of sewing each day?

It is hard to “see” the results of my sewing, a lot of my 15 minutes were closer to 5 or 10 minutes hand stitching applique that has been glued for a while.

hot air balloon glued down stitch line

So I have gotten past about half of the hand stitching on this section of the quilt.

This applique will migrate to another project from my original plans I think.

Geesh, I noticing that I have a lot of projects I started back in 2011 (the date for this quilt’s start).

Anyway, I did the weave quilt early in the month.

Circular ends

I have made appointments with two long arm quilters during the month. For the first time ever.

I have been trolling around Quilter’s Cache lately. I made the cutest Galaxy Star from that site.

galaxy star pattern via quilters cache

I hand stitched some batting that wasn’t quite big enough for a smaller project, I basted with spray baste, and am now starting to ditch quilt the borders on my domestic machine.

I also made a few small items for the guild’s boutique for the quilt show.

5pointedpincushiontwo

A few pincushions. This uses 5 squares of each fabric type. I found the tutorial online. I skipped the adding the paper step, but I had to hand stitch the middle closed on the pieces because there are several seams that stop at the quarter inch corner.

And I made 60 degree coasters from another pintrest link. These were easy, but I added batting just below the piece at the bottom of the coaster.

60degreecoasterafterflip

That is the finished project. Without top stitching anyway.

Here’s how they start. Pretty easy.

60degreecoasterstart

I bought my 3 day ticket for the quilt festival in June, and I signed up with a class/lecture by a quilter I was impressed with that is in a nearby guild, with one of the twilters, Carole!

Since changing my computer around, I never reinstalled photoshop (over 10 years old), so I have been using PicMonkey website to edit my photos. Very similar to Picnic that I reviewed a long time ago. Not bad, gives you plenty of free editing options.

Anyway, that’s me checking in with you! How have you been? March-A-Long! Good work getting those projects done!

 

h1

34.9 March A Long 2014 – My progress and video

April 1, 2014

March A Long 2014

I had to cut my last post short due to video problems with the camera battery. After recording 3 times Sunda, I gave up trying on Sunday.

I also recorded this 3 times today due to video length. 🙂 Here it is, my report & video.

What am I up to??

I cut the very last of my charm squares, I have them all baggied up.

Some of my cubbies have been reorganized while I watch episodes of mythbusters on netflix.

I participated in a few conversations on facebook about Modern Quilting (the aesthetic) vs modern (or contemporary) quilting (the movement).

Some on the Quilting groups too. I spammed the internet this weekend looking for things to do, participate in. People were being a little more quiet than I was hoping.

I uploaded some pictures & managed the guild roster on our guild website (major fun) & verified that changes were made on someone else’s website that referenced our guild (EXCITING FUN I KNOW!)

So much fun I had to dance with this quilt a little bit today.

greyquiltinglinesonsunshinequilt

I cursed at my vintage machine for a while when it kept breaking threads. Simply trying to do straight line quilting, no jerky motions, the machine was having none of it.

I tried:

  • rethreading top
  • rethreading bobbin
  • changing the bobbin thread
  • changing the top thread (brand AND spool)
  • holding onto those loose threads really tightly
  • changing the needle
  • changing the needle type
  • cleaning out the whole bobbin area for spare thread / lint
  • changing from FMQ (darning) foot to walking foot (haven’t used in a long time)
  • adjusting the tension on the top down

The last attempt on my vintage machine, I had seen a flicker in my light switch that related to the same power strip as my vintage machine and I decided there was potentially an electrical threat.

I haven’t had the machine looked at, and sometimes when I have used it, it sounds like it’s taking the motor time with catching up with the fact the foot pedal has been pressed in.

So now the machine has a cover. To keep me from staring at it longingly.

makeitsewonvintagemachine

For another troubleshooting idea I decided to baste my little scrapitude quilt. To have something without a pieced back to quilt against and to have enough fabric left over for a test quilt on the side.

And I redecorated sorta. The blue & white quilt on the left top is a quilt I got at a quilt auction 3 years ago.

decoratedroomandscrapitude

And this quilt I think our shop is selling the pattern, or was, as this was a quilt I got as an auction quilt made by our featured quilter. Not her usual style of quilts, but I really liked it.

littlehouseauctionquilt

I recap with my sergeant & my marching ants in the video below.

For those of you who like the voice & the ants.

In this video, I share my current book haul.

March-A-Long Post #1 & #2  & #3 & #4 & #5 & #6 for 2014

I am willing to part with these items as a thank you gift for a lucky someone (or three) to be determined by email from who I end up contacting in a couple of weeks.

icouldpartwiththese

I love that you have all went through this with me again for another year! All receive pats on the back weather or not we actually sewed every day. I think I missed 3 days total in March, which is EXCELLENT progress! Completely made up for it in other days!

So make sure if you haven’t already, sign up on the inlinkz for this week. Or leave a comment below.

h1

34.4 Great start to the March-A-Long

March 2, 2014

Thanks everyone for participating in this year’s March-A-Long! Or thinking about it at least.

March A Long 2014

March-A-Long we attempt to craft for at least 15 minutes a day for the entire month of March.

No rules, no drill sergeants, no stopwatches! Just do something quilty for the month of March.

For some people, crafting can be intimidating if we don’t have a “large chunk of time”.

But this March, can you start thinking of the little things that can help move your projects forward, little bits at a time.

OR sew a LOT of time if you’re lucky enough to be able to do it!

The previous post has some links in the comments to others who are participating in the March – A – Long, and a video about some ideas I had to help you get started thinking in terms of a little bit of crafting.

So far, there’s only been 2 days of March, but as it’s the weekend, I have seen a LOT of quilters & #twilters work towards sewing in March!

It’s exciting to be in such a quilting & sewing frenzy!

My 2 day progress has been to cut up scraps and to iron/wash some new to me fabric.

march cutting scraps 1

It’ll get more challenging the upcoming week with work schedules, but I am committed to attempt to sew 15 minutes right along with the rest of ya’all.

I also have a quilt ready to Free Motion Quilt (FMQ) on my Domestic Sewing Machine (DSM). I am probably headed toward basting another small project first however.

Feel free to share your weekend now, or share more next weekend after sewing (or designing or whatever) next week!